December Winter Operations: Facility Reliability Tips | TPS Skip to content

December Winter Operations: How Cold Weather Impacts Facility Reliability

December Winter Operations: How Cold Weather Impacts Facility Reliability

Table of Contents

When temperatures drop, facilities feel it fast. Winter conditions don’t just challenge day-to-day operations; they expose vulnerabilities that can quickly take critical systems offline. Poor circulation, unexpected heat loss, and uninsulated components become significant risks when equipment is operated in suboptimal temperatures.
To maintain facility reliability at low temperatures, operations teams must understand how cold weather affects separator packages, glycol dehydration systems, and heater treaters—and what preventive steps can keep production uninterrupted throughout the winter.
In this guide, we break down the most common cold-weather impacts of December winter operations and the proactive measures that help protect uptime and efficiency all season long.

How Low Temperatures Expose Operational Weaknesses?

Cold weather acts as a stress test on production equipment. Small inefficiencies that go unnoticed in warmer months can escalate quickly once temperatures reach freezing.

1. Circulation Issues

Low ambient temperatures increase fluid viscosity, slowing circulation through separators and dehydration systems. This can lead to:
  • Reduced separation efficiency
  • Incomplete dehydration
  • Pressure drops
  • Freeze-ups in low-flow areas

2. Heat Loss Across Critical Components

Without proper temperature retention, separator packages and glycol systems struggle to maintain optimal operating conditions. Contributing factors include:
  • Insufficient insulation
  • Heat tracing failures
  • Exposed piping

3. Uninsulated or Inadequately Protected Equipment

Equipment without proper winterization is at a higher risk of:
  • Freeze blockages
  • Inconsistent process temperatures
  • Premature component wear
Heater treaters are especially vulnerable to cold, wind, and moisture, all reduce thermal stability.

Impacts on Separator Packages, Glycol Dehydration Systems & Heater Treaters

Separator Packages

  • Cold temperatures thicken emulsions.
  • Water separation becomes more difficult.
  • Internal temperatures may drop below design intent.

Glycol Dehydration Systems

  • Reduced circulation lowers regeneration temperatures.
  • Cold glycol absorbs heat more rapidly.
  • Components are prone to freeze-related interruptions.
See related upgrades that support performance: Glycol Dehydration Systems

cold weather maintenance

Heater Treaters

  • Increased heat loss reduces efficiency.
  • Burner behavior becomes inconsistent in cold climates.
  • Unprotected components become failure points.

Why Preventive Maintenance Matters in Winter?

Proactive winterization and inspection significantly improve preventative maintenance outcomes. Identifying vulnerabilities before temperatures fall helps facilities avoid costly shutdowns and enhance operational stability.
Benefits include:
  • Improved uptime
  • Reduced emergency repairs
  • Better energy efficiency
  • Longer equipment lifespan

How TPS Supports Winter Operations?

TPS helps facilities stay online all winter by identifying cold-weather vulnerabilities and implementing targeted corrective actions. Support includes:
  • Heat tracing and insulation checks
  • Firetube and burner evaluations
  • Circulation and temperature stability assessments
  • Winterization recommendations for separators, glycol units, and heater treaters
Each system is designed for safe, effective operation, but winter requires proactive planning to maintain peak reliability.
With TPS, operators gain:
  • Winter operation strategies
  • System upgrades to reduce freeze events
  • Insights that improve uptime and performance

Frequently Asked Questions

What causes most winter downtime?

Heat loss and circulation failures are the primary contributors, especially when insulation or heat tracing is insufficient.

When should facilities schedule winter maintenance?

Ideally, in early fall, October or November, before the first freeze. Additional mid-season checks help maintain reliability.

Which equipment is most at risk?

Separator packages, glycol dehydration units, and heater treaters are required due to temperature-sensitive processes and fluid movement.

Strengthen Your Winter Operations With TPS

Winter puts every system to the test. Don’t wait for cold weather to expose costly vulnerabilities. TPS helps facilities maintain uptime, reduce freeze risks, and operate efficiently all season long.
Ready to improve reliability at low temps?

Contact TPS to schedule a winter operations assessment.

Share this Article

Facebook
LinkedIn
Email

Meet the Author

Danny Wright, Total Product Services

soonerdev

Recent Articles by Total Product Services

Request a Quote